Turnkey house »

Turnkey house

Project documentation:

  • Plans;
  • Facades;
  • Sections;
  • Plan-scheme of tying the house to the plot;
  • Perspective images;
  • Window and door specification.

Foundation:

  • Column-strip with reinforced concrete screed or pile with insulated wooden platform;
  • Diverting sewer pipes below the “0” mark, embedded parts for engineering inlets;
  • Arrangement of a columnar foundation and a supporting wooden platform under the terrace.

Power frame and insulation:

  • External walls – a beam with a cross section of 145*45 mm., external sheathing with OSB plates, insulation with a cross method of minvatatov 200 mm.;
  • Internal partitions – a beam with a cross section of 9545 mm., 14545 mm, sound insulation minvatoyutov 100-150 mm.;
  • Interfloor overlap – a beam with a cross section of 45*195 mm, sound insulation thickness 150 mm, rough floor of the second floor – OSB plates with a thickness of 22 mm;
  • The rafter system of the roof – a beam with a section of 45195 mm., 14545 mm., insulation of the roof minvatoyutov 250 mm;
  • Vapor insulation reinforced film Strotex 110, with glued joints.
  • Fasteners and consumables (complex);
  • Dry planed lumber impregnated with an antiseptic and fire retardant immersion method.

Roof:

  • Metal tile “Monterrey” thickness 0.45 mm;
  • Waterproofing membrane;
  • Crate 25*100 mm;
  • Counter rail 40*50 mm;
  • Binding of soffits: wood / plastic / metal;
  • PVC drainage system, PROFIL/BRYZA;
  • Special planks.

Terrace:

  • Supporting wooden platform;
  • Clean terrace board (spruce/pine, impregnation color to choose from);
  • Lining of the roof;
  • Wooden railings and columns (color of impregnation to choose);
  • Arrangement of wooden stairs (according to the project).

Facade:

  • Facade plaster (bark bark/lamb) or wooden falsework or vinyl siding;
  • Wind barrier membrane along the perimeter of the external walls.
  • Windows and entrance doors:
  • Metal-plastic profile REHAU 70, five-chamber;
  • Hardware – anti-burglary with a microlift;
  • 2-chamber double-glazed window with double energy-saving spraying;
  • External lamination, PVC window sills, metal moldings;
  • Installation using the “Warm installation” technology;
  • Entrance doors with insulating frame and fabric made in Ukraine.

Electricity:

  • VVHng cable (section 1.5-2.5);
  • Metal sleeve TM “SCaT” (galvanized with broaching);
  • “Hager” automation;
  • HagerVolta switchboard;
  • Introduction PZV “Hager”;
  • Grounding (modular, pin, galvanized) + metal hose grounding;
  • Outputs under sockets, switches, lighting devices (according to the project) “without installation of final devices.

Heating and water supply:

  • Boiler gas / electric / solid fuel / electric convectors
  • UTERM /Kermi/Romstal radiators;
  • “Giacomini” thermoregulators;
  • Laying pipes for water and sewage in the house (according to the project);
  • Floor heating: (according to project documentation).

Ventilation:

  • Ventilation fungi on the roof;
  • Installation of a ventilation fan channel;
  • Forced, exhaust ventilation: kitchen, bathroom (separate ventilation channels).

Interior decoration:

  • Gypsum board or wooden paneling/false timber;
  • Moisture-resistant plasterboard in bathrooms, toilets, technical rooms;
  • Insulated concrete screed (50mm extruded polystyrene foam).

    Потрібна консультація?

    Залишіть Ваші дані і наш менеджер
    обов'язково з Вами зв'яжеться

    captcha

    У разі подальшого замовлення на будівництво

    проект передається замовнику безоплатно

    Допомога у оформленні дозвільних документів на будівництво

    Знижки на будматеріали

    We have already answered on some questions

    The company started its work in 2010. Over 12 years of work, we have implemented more than a hundred projects - from the design of objects of various complexity to turnkey construction. You can familiarize yourself with our portfolio of completed works on the website - section "We built"

    More than 100 projects (including design and construction) have been implemented over all the years of work.

    First of all, it is necessary to start with the development of a working project, which serves as "installation instructions" for builders and includes the entire scope of work that must be performed during construction. Based on the project documentation, an estimate is formed to calculate the cost of construction. Next, a schedule of works and a financing schedule are prepared, which allows the Customer to have a clear understanding of the terms of execution and the cost of each stage of construction work. You can order a project from us or provide a ready-made one from another project organization.

    So. We perform construction works according to projects executed by third-party organizations. However, before the start of construction, such a project is inspected by specialists of our Company. If necessary, we provide the Customer with reasoned proposals and wishes for finalizing the project documentation or issue a conclusion that the project does not require finalization.

    Working with us, you get an individual approach and high-quality performance! All work is performed by professionals who have been in the profession for more than a year and know all the specifics of the construction of this or that object. Daily quality control of works and materials at the facility is provided by the foreman, the chief engineer, issues arising in the construction process are resolved quickly in an operational manner. Also, our Customers have the opportunity to observe the progress of construction thanks to photo, video recording and online video surveillance 24/7. The terms and cost of construction are fixed in the contract and estimate, we provide guarantees for up to 10 years!

    Yes, by prior arrangement, it is possible to visit a facility under construction or already built. At the facility, you will be able to get answers to questions that may arise regarding certain construction technologies, volumes, cost, etc. We also post photo reports and videos on our official Facebook & Instagram pages. In the office online, you can see what is happening at this or that object.

    Payment is made in stages, according to the financing schedule, which is an integral part of the contract for the construction of a house. Each stage represents a separate set of works on the construction of the capital structure of the house (this is the construction of the foundation, walls, floor, roof, etc.)

    When concluding the contract, we take into account all issues that may arise during the construction process. The construction cost is fixed in the national currency (Ukrainian hryvnia) for the entire construction period, which gives us the opportunity to state: "the cost remains unchanged."

    The initial cost can increase during the construction process only for some objective reasons: a significant increase in the prices of materials, a change in design decisions at the initiative of the Customer, the need to perform additional works that could not be foreseen at the stage of design works.

    An increase in the initial cost of construction in all cases is agreed with the Customer and drawn up in the form of an Additional Agreement to the Contract.

    We can visit the facility both before and after the conclusion of the contract.

    Our specialists go to the place of the proposed construction in order to familiarize themselves with the site and the area. This is necessary for planning the organization of access roads to the construction site, determining the location of the house and other structures, marking the territory of the site for placing construction materials, construction and domestic premises for storing tools, etc.

    Thus, in accordance with the current Law of Ukraine "On the Regulation of Urban Development", before starting construction, it is necessary to obtain a construction permit from local authorities.

    Our Company provides comprehensive consulting support to Customers in this matter.

    Approximately 3-5 months.

    What is a "box"? What types of work are performed during the construction of the "box"?

    The "box" of the house is a structure consisting of a foundation, walls, floor slabs, staircases (if necessary) and a roof.

    During the construction of the "box" of the house, the following are performed: earthworks, concrete works, masonry works, roofing works

    When choosing building materials, which are included in design decisions and estimates, we take into account the wishes of the Customer, recommendations and clarifications that are of a recommendatory nature, building regulations, as well as our experience in using certain materials.

    You can start construction at any time of the year. Each period has its advantage. For example, prices for materials are lower in winter than in summer. But to perform some types of work in winter time (when the temperature regime is below normal) additional costs are required, as well as a longer period for performing this or that type of work. You can get a more detailed consultation on this issue from our specialists in the office.

    Yes, maybe. However, before starting construction work, it is necessary to obtain information about the quality characteristics of the existing foundation. A specialist of our Company conducts an inspection for the presence of cracks, sinks in concrete, the uniformity of the color of concrete in the foundation, the depth of laying the foundation, etc. is determined.

    Yes, it is possible. We provide different conditions for Customers depending on their wishes and financial capabilities. Options are discussed and a compromise solution is found.