Everything starts with the project: how to choose the right project for a wooden house? »

Everything starts with the project: how to choose the right project for a wooden house?

Any construction plan is impossible without a project. In this article, we will consider the main points that must be taken into account when choosing a wooden house project.

Why do you need a project?

If you think that building a house requires only a plan and a picture of the exterior, then you are deeply mistaken. To implement the project, certain sections of the working documentation or working project (RP) are required. Such a project, first of all, gives the builder and the contractor confidence in the reliability and durability of the house and the ability to control the amount of materials.

What projects exist?

Finished projects:

Many years of construction experience allows companies to create a so-called catalog of ready-made projects already implemented on. In this case, there is no need to puzzle over the layout, functionality, appearance of the house, etc.

By choosing a ready-made project, you will significantly save time for its development, as well as save on costs associated with project development.

Ready-made projects with the possibility of making changes:

If you liked a ready-made project, but you want to change the layout, dimensions, appearance of the house, etc. – please do. Our architects will make any changes, according to the current DBN

Individual design:

In the event that the customer has his own ideas or certain needs that he wants to implement, our company will offer an individual design service. In an individual project, you can realize all your dreams and fantasies about the future house. Such a house will meet your requests as much as possible. Also, individual design is often required when planning the construction of a house on a specific plot.

What should be considered when choosing a house project?

Area of the site where construction is planned.

It is necessary to think rationally about the ratio of the area of the house and the area of the plot. Perhaps in the future you will want to add a veranda, shed, terrace or organize a recreation area to the house. In this case, you will need additional space. You should also plan in advance the construction of other objects that are separate from the house (for example, a bathhouse, garage, gazebo, etc.) and rationally correlate their location and area.

Geometry and topography of the site.

These parameters are very important if your site is irregularly shaped or has some relief features. Most likely, in this case, you cannot do without an individual project.

Seasonality of residence.

If you plan to use the house as a cottage for living in the spring and summer period, then perhaps a house project without a fuel room (boiler room) will suit you.

Architectural and stylistic preferences.

These factors are fundamental in terms of the aesthetic perception of the house, both from the outside and from the inside. Today, there are many possibilities (adding elements) to transform a house: stained glass windows, spacious terraces, an unusual roof shape, a non-standard balcony, etc.

How many people will live in the house?

Depending on the number of permanent residents, it is necessary to think rationally about the layout and functionality of the premises – the number of bedrooms and bathrooms. Perhaps the second floor (attic) will reduce construction costs and increase the usable area of the house. The room sizes should not be too small. They should be planned depending on the purpose (kitchen, bedroom, etc.). You should also not make too low ceilings. Staying in the rooms should be comfortable.

Think carefully about the most important rooms in the house for you and your family.

If your house will have frequent guests, then in this case, think carefully about the recreation area – the living room, as well as possibly an additional room where your guests can stay overnight.

For fans of billiards, the attic floor on the second floor is ideal. It can also be used as a game room or gym.

Still in doubt about choosing a house project? Look at our catalog of ready-made projects, and if necessary, order an individual project. In the case of an order from our construction company, the project is transferred to the customer free of charge.

    Потрібна консультація?

    Залишіть Ваші дані і наш менеджер
    обов'язково з Вами зв'яжеться

    captcha

    У разі подальшого замовлення на будівництво

    проект передається замовнику безоплатно

    Допомога у оформленні дозвільних документів на будівництво

    Знижки на будматеріали

    We have already answered on some questions

    The company started its work in 2010. Over 12 years of work, we have implemented more than a hundred projects - from the design of objects of various complexity to turnkey construction. You can familiarize yourself with our portfolio of completed works on the website - section "We built"

    More than 100 projects (including design and construction) have been implemented over all the years of work.

    First of all, it is necessary to start with the development of a working project, which serves as "installation instructions" for builders and includes the entire scope of work that must be performed during construction. Based on the project documentation, an estimate is formed to calculate the cost of construction. Next, a schedule of works and a financing schedule are prepared, which allows the Customer to have a clear understanding of the terms of execution and the cost of each stage of construction work. You can order a project from us or provide a ready-made one from another project organization.

    So. We perform construction works according to projects executed by third-party organizations. However, before the start of construction, such a project is inspected by specialists of our Company. If necessary, we provide the Customer with reasoned proposals and wishes for finalizing the project documentation or issue a conclusion that the project does not require finalization.

    Working with us, you get an individual approach and high-quality performance! All work is performed by professionals who have been in the profession for more than a year and know all the specifics of the construction of this or that object. Daily quality control of works and materials at the facility is provided by the foreman, the chief engineer, issues arising in the construction process are resolved quickly in an operational manner. Also, our Customers have the opportunity to observe the progress of construction thanks to photo, video recording and online video surveillance 24/7. The terms and cost of construction are fixed in the contract and estimate, we provide guarantees for up to 10 years!

    Yes, by prior arrangement, it is possible to visit a facility under construction or already built. At the facility, you will be able to get answers to questions that may arise regarding certain construction technologies, volumes, cost, etc. We also post photo reports and videos on our official Facebook & Instagram pages. In the office online, you can see what is happening at this or that object.

    Payment is made in stages, according to the financing schedule, which is an integral part of the contract for the construction of a house. Each stage represents a separate set of works on the construction of the capital structure of the house (this is the construction of the foundation, walls, floor, roof, etc.)

    When concluding the contract, we take into account all issues that may arise during the construction process. The construction cost is fixed in the national currency (Ukrainian hryvnia) for the entire construction period, which gives us the opportunity to state: "the cost remains unchanged."

    The initial cost can increase during the construction process only for some objective reasons: a significant increase in the prices of materials, a change in design decisions at the initiative of the Customer, the need to perform additional works that could not be foreseen at the stage of design works.

    An increase in the initial cost of construction in all cases is agreed with the Customer and drawn up in the form of an Additional Agreement to the Contract.

    We can visit the facility both before and after the conclusion of the contract.

    Our specialists go to the place of the proposed construction in order to familiarize themselves with the site and the area. This is necessary for planning the organization of access roads to the construction site, determining the location of the house and other structures, marking the territory of the site for placing construction materials, construction and domestic premises for storing tools, etc.

    Thus, in accordance with the current Law of Ukraine "On the Regulation of Urban Development", before starting construction, it is necessary to obtain a construction permit from local authorities.

    Our Company provides comprehensive consulting support to Customers in this matter.

    Approximately 3-5 months.

    What is a "box"? What types of work are performed during the construction of the "box"?

    The "box" of the house is a structure consisting of a foundation, walls, floor slabs, staircases (if necessary) and a roof.

    During the construction of the "box" of the house, the following are performed: earthworks, concrete works, masonry works, roofing works

    When choosing building materials, which are included in design decisions and estimates, we take into account the wishes of the Customer, recommendations and clarifications that are of a recommendatory nature, building regulations, as well as our experience in using certain materials.

    You can start construction at any time of the year. Each period has its advantage. For example, prices for materials are lower in winter than in summer. But to perform some types of work in winter time (when the temperature regime is below normal) additional costs are required, as well as a longer period for performing this or that type of work. You can get a more detailed consultation on this issue from our specialists in the office.

    Yes, maybe. However, before starting construction work, it is necessary to obtain information about the quality characteristics of the existing foundation. A specialist of our Company conducts an inspection for the presence of cracks, sinks in concrete, the uniformity of the color of concrete in the foundation, the depth of laying the foundation, etc. is determined.

    Yes, it is possible. We provide different conditions for Customers depending on their wishes and financial capabilities. Options are discussed and a compromise solution is found.